City of Port Coquitlam:
As-Constructed Dike Drawings and Significant Reports and Studies
COQ-OM-M-4 (pdf 4.8mb) |
District of Coquitlam and the City of Port Coquitlam |
|
Operations and Maintenance Instructions, Flood Control Works, Volume 3 2 AS CONSTRUCTED DRAWINGS Part 1 - Pitt River Flood Control Works Part 2 - Coquitlam River Flood Control Works |
Crippen Engineering Ltd., Associated Engineering |
STUDY REPORTS
W-2805
(pdf 6.2mb) |
City of Port Coquitlam |
|
Coquitlam River Hydrology Review |
Water Management Consultants |
UMFW 2007 AS-BUILT DRAWINGS AND DESIGN REPORTS
Coquitlam River left bank dwgs. (pdf 1.8mb) |
City of Port Coquitlam |
|
Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank |
Associated Engineering |
Pitt R right bank dwgs.
(pdf 1.7mb) |
City of Port Coquitlam |
|
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike |
Associated Engineering |
Harbour St Stn&Valiant Sort.
(pdf 745kb) |
City of Port Coquitlam |
|
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pumpstation |
Associated Engineering, Golder Associates |
Pitt R Dike geot. (pdf 7.7mb) |
City of Port Coquitlam |
|
Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works Pitt River Dike, Port Coquitlam BC |
Golder Associates |
Colony fm geot. (pdf 4.8mb) |
City of Port Coquitlam |
|
Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works IR#2 and Colony Farms Dike Pitt River Road Port Coquitlam BC |
Golder Associates |
|
|